Technical Articles

Technical Articles and Specifications

Search: Help
Brands

Quickly and easily find the marine parts you are looking for by selecting the manufacturers catalog and searching by part number.

Blog RSS Link

Marine Engines Repower – Bayliner Cierra 2655, 1991 model Mercruser MCM 5.0l LX
Dennis, Thanks for your inquiry and the opportunity at earning your business. Since Mercruiser made both Alpha and Bravo sterndrive models with that engine I would not be able to tell you without knowing which one your engine is setup for. Can you give me the original engine serial number? Or can you tell me if [...]

4.3L Marine Engine Longblock Performance Specification
Mike, Thanks for your inquiry and the opportunity at earning your business. The Hp rating for longblocks is determined by the fuel system that’s install back onto the engine. For example since GM only produced one marine version of the 4.3L during this timeframe Mercruiser used this same longblock on their 190 Hp 2 barrel carb [...]

Marine Engines – Replacement marine engine for my boat 5.7 mercruiser 1992 #0d763634
Marty, Thanks for your inquiry and the opportunity at earning your business. Using the links below you can review your options. Let me know if you need any further technical information or help placing your order. In either case I will be glad to assist! Link to Block Code/Serial Number Location http://www.perfprotech.com/store/app_themes/PPT/images/block-casting-no.jpg Link to Remanufactured Longblocks http://tinyurl.com/68kcet8 Link to Remanufacturing [...]

Suzuki Marine Outboard Motors – Replacing a Fuel Pump on a DF70
Step by Step Video Instructions illustrating how to change an electric fuel pump on a Suzuki DF70 outboard motor. Watch Video

Boat Trailer Parts and Accessories – How to Replace a Boat Trailer Hub
Step by Step video instructions illustrating how to replace a leaky oil filled hub on a boat trailer. Watch Video

You are Here: Skip Navigation LinksTech Library > Sterndrives & Transom Assemblies > Skeggard Install Skip Navigation Links

INSTALLATION.
.

Before you start the installation, make sure that you have 2 to 3 inches of skeg remaining.

Prepare the skeg of the lower unit by filing or sanding any rough or jagged edges that may exist. If your skeg is bent, than you must straighten it before installation. Remove the hardware from the SKEGGARD. Install onto your new or damaged skeg. Tap in place with a mallet or block of wood. DO NOT FORCE!!!

Using the predrilled holes on the SKEGGARD as guides, drill through your skeg using a 1/4" drill bit.

Install the hardware through the SKEGGARD only finger tight AT THIS TIME. The hardware must tighten against the sides of the SKEGGARD for proper installation. If this does not happen, you need to reorganize the hardware to achieve the correct length. Different lengths can be achieved by taking the hardware apart and mixing the extra studs and posts that were supplied with your kit.

The mounting bolts that are included with the SKEGGARD are a tamper proof type of hardware, Designed to Shear in the event of a severe impact.

Remove the hardware, assuming that you only installed finger tight, apply the LOCTITE supplied. To do this, shake well before use. Make sure threads are clean. To open tube, snap tube neck below end cap. Apply LOCTITE to threaded areas, assemble hardware and tighten securely. You must wait 24 hours before use to allow LOCTITE to fully cure. Failure to do so may result in loss of product.

The SKEGGARD is warranted against defects in workmanship. Manufacturer will repair or replace upon return of the defective unit.
.
.


Install SKEGGARD onto your skeg.
Drill two mounting holes.
Tighten SKEGGARD mounting bolts.
DISCLAIMER - every effort is made to present correct information.
Dealer not responsible for errors in text - please verify by phone message. Webmaster